What JM Glassworks
Delivered.
The St Francis package combined double glazing, four Capral AGS commercial window and door systems, specialist double angled window detailing, fabrication and on-site installation.
Commercial glazing package
The glazing package was built around Viridian EnergyTech double glazing, combining 6mm clear toughened glass with 6mm grey Viridian EnergyTech glass, selected to meet the thermal and safety performance required for the education setting.
Windows & door systems
Coordination & documentation
JMG worked closely with Fairbrother to coordinate window selections and detailing — including the double angled window configurations — against the project drawings and align the glazing package with the wider construction programme.
Fabrication & installation
JMG managed fabrication of the specified window systems and double-glazed units, followed by on-site installation across the building’s commercial window and door openings.